Walker Utilities Inc. installed this 16″ water main along Kirkpatrick Ln. in Flower Mound, Texas during underground water utility construction of the Cedar Creek subdivision. Walker Utilities Inc. acted as general contractor on this project,
Read moreCategory: Blog Post
Sewer main installation in Hurst, Texas
Walker Utilities Inc. crew members checking grade on the gravel bedding while installing a sewer main at Bell Station, a 96 lot single family subdivision in Hurst, Texas.
Read moreWater, sewer, and storm drain infrastructure in Keller, Texas
Walker Utilities Inc. installed the water, sewer, and storm drain infrastructure for the Silver Lakes subdivision in Keller, Texas. Included in the storm drain improvements was this multi-barrel Contech pipe crossing under Pate Orr Rd.
Read more